OEG Renewables Temporary Power

Temporary power

Bespoke, all-encompassing temporary power solutions for the offshore wind sector.

OEG Renewables Balance of Plant Workers

Experts in our field

Experience

Highly experienced on and offshore management team, technicians and crew - with over 16 offshore projects undertaken since 2013. We have highly experienced personnel throughout the disciplines, both on and offshore. The knowledge and lessons learnt are cascaded into each and every project and high levels of safety are implemented from the project kick-off.

Design

Generators designed to interface correctly with the transition piece and turbine - with space often at a premium on the transition piece platform. We have the provision to both design and fabricate customised solutions. As a general rule, our solutions are of a modular set-up requiring one lift on (from the installation vessel) and several lifts off (utilising the TP crane); often the most cost-effective solution for the project.

Endurance

Fuel tanks with as large as practical capacity to increase endurance. When calculating the fuel consumption we look at the distance offshore, time of year with associated weather conditions, and availability of refuelling vessels. Recent projects have shown that a minimum of 2000 litres provides a stable platform to ensure continual generator availability. To achieve that we often fabricate tanks in-house to allow the modular set-up with a minimised footprint.

Installation

Aims to install onto transition piece at the staging port to minimise offshore works. We have undertaken projects where the installation of the generator is undertaken whilst the transition piece is sited in the staging port; this allows full testing and commissioning prior to heading offshore, whilst also minimising any costly offshore lifts from the installation vessel.

Fuel capacity

State of the art refuelling vessels with an onboard fuel capacity of over 40 Tonnes. Whether it be our own vessels or similar tonnage, we provide only vessels that have the sufficient onboard fuel capacity to allow multiple tanks to be refilled during a single offshore trip; in tandem with this capacity, we provide onboard accommodation for all technicians to give sufficient endurance on far offshore windfarms.

Decommissioning

Contemporary modular design for ease of decommissioning on project completion. Our 2000 and 3000 litre models break down into three and five individual components respectively; this then reduces the largest lift to under 1.5 tonnes and therefore into the capability of the transition piece crane; this crane combined with the ‘stern to’ capability of the Manor Venture allows for a cost-effective demobilisation.

Wind Turbines
Temporary power

Temporary power pods

Whether your requirement is for the construction phase or to support operations & maintenance downtime, we can supply various tried and tested temporary power solutions for the offshore wind sector. These can also be tailored to suit unique requirements. 

Why OEG Renewables

At OEG Renewables, we are market-leaders in the provision of temporary power solutions and our mechanical and electrical engineering teams have extensive experience with all aspects of power generation.

We are capable of dealing with the many and varied challenges encountered on offshore wind projects globally; we bring together the expertise and experience of our teams of marine and engineering professionals to assist us with the growing industry demand for efficient and reliable offshore solutions.​

temporary power_team
OEG Shaun

Want to find out more?

Our team of technical experts are here to support you.